King County · Builder Permitting
King County New-Construction Solar for Builders
New-construction solar permitting in King County depends on one thing first: whether the lot sits in unincorporated territory or inside a city. King County Permits only has authority over unincorporated land. Seattle, Bellevue, Kent, Renton, Federal Way, Redmond, Kirkland, and every other incorporated city run their own building departments. Here is how permitting, inspections, and WSEC credits actually work once you confirm which authority applies to your lot.
Unincorporated only
King County Permits (Dept. of Local Services) covers unincorporated land only, not the incorporated cities inside the county
Two permits, one system
A solar install in unincorporated King County typically involves a county building step and a separate WA L&I electrical permit
2021 WSEC
Same statewide energy code and credit table apply whether the lot is unincorporated or inside a city
Phase 1
Two Permitting Authorities, One County Name

King County Permits, part of the county’s Department of Local Services, issues building and land-use permits for unincorporated areas. That includes communities like Vashon Island, Fall City, and pockets of the Snoqualmie Valley that carry a King County mailing address but sit outside any city limit.
Once a lot falls inside an incorporated city, King County Permits has no authority there. Seattle, Bellevue, Kent, Renton, Federal Way, Redmond, and Kirkland each run their own building department and their own submittal process. A builder working a plan book across several King County jurisdictions needs to confirm, lot by lot, which authority actually applies before submitting.
Phase 2
Where the Electrical Permit Actually Comes From

This is the part that trips up crews used to single-jurisdiction permitting. For a solar install in unincorporated King County, the building side of the permit runs through King County Permits, but the electrical permit for the PV system runs through the Washington State Department of Labor & Industries, not the county.
As a result, that split matters for scheduling. The county and L&I run separate submittal systems and separate inspection queues, so a delay on one side does not automatically show up on the other. Solphos tracks both submittals on unincorporated King County jobs so a builder is not stuck reconciling two agencies mid-build.
Phase 3
Building Permit or Exemption: Which Track Applies
Not every rooftop solar install in unincorporated King County needs a full building permit review. King County publishes a Solar Exempt Permit Checklist for qualifying installations, letting straightforward rooftop arrays skip the standard building permit track.
The exemption applies to the building permit only. However, it does not remove the separate electrical permit requirement through L&I. Larger systems, ground-mount arrays, or installs that involve structural changes to the roof framing typically fall outside the exempt checklist and need the standard building permit path instead.
Builders should confirm which track applies before finalizing a construction schedule. An exempt install can move faster. In contrast, a non-exempt one needs the standard county review built into the timeline from the start.
Phase 4
WSEC Credits Don’t Change by Jurisdiction
Permitting authority shifts between unincorporated King County and its cities, but the energy code does not. The 2021 Washington State Energy Code and its credit table, WAC 51-11R-40621, apply statewide.
Same credit table: Option 6.1, Renewable Electric Energy, credits solar the same way on a Vashon Island lot as it does inside Kirkland or Redmond.
Same documentation: a PVWatts run tied to array size, tilt, and orientation supports the credit regardless of which building department reviews the permit.
Different review path: what changes is who reviews the credit documentation, the county for unincorporated lots, or the relevant city department once a lot is inside city limits.
For a full breakdown of every WSEC credit category and how solar compares to other options, see the complete credit table.
Phase 5
Coordinating a Plan Book Across the County
Builders running the same plan set across multiple King County lots often mix jurisdictions without realizing it. One lot might sit in unincorporated territory near Fall City. Next, that lot might fall inside Renton or Kent city limits, even though every address reads “King County” on the mailing label.
Solphos confirms the applicable authority for each lot before building the solar package, so the submittal, whether it routes through King County Permits and L&I or through a city building department, matches what that specific address actually requires.
A note on scope: this page covers permitting for unincorporated King County specifically. Incorporated cities within the county, including Seattle, Bellevue, Kent, Renton, Federal Way, Redmond, and Kirkland, run their own building departments and their own electrical inspection processes, which can differ from the L&I routing described above. Confirm the applicable authority for your specific lot before relying on this page for a city address. See our Seattle and Bellevue pages for city-specific detail on those two jurisdictions.
Frequently Asked Questions
Does King County or the city handle my solar permit?
It depends on the lot. Unincorporated King County lots go through King County Permits for the building step and Washington State L&I for the electrical permit. Lots inside a city, such as Seattle, Bellevue, Kent, Renton, Federal Way, Redmond, or Kirkland, go through that city’s own building department instead.
Do all solar installs in unincorporated King County need a full building permit?
No. King County publishes a Solar Exempt Permit Checklist for qualifying rooftop installations that skip full building permit review. However, the separate electrical permit through Washington State L&I is still required either way.
Does the WSEC credit table change based on jurisdiction?
No. The 2021 WSEC and its credit table, WAC 51-11R-40621, apply statewide. The same solar credit option and the same documentation requirements apply whether the lot is unincorporated or inside a King County city.
What if a plan set gets built across both unincorporated land and city lots?
Confirm the applicable authority lot by lot. Two addresses in the same county can route through entirely different building departments, and only the unincorporated lots route through L&I for the electrical permit.
Where do builders submit for unincorporated King County permits?
Through the King County Permitting Portal, accessed via the county’s MyBuildingPermit.com listing. Electrical permits for the solar system are submitted separately through Washington State L&I.
Related Resources for Builders
New Construction Solar for Seattle Builders →
Bellevue WSEC Solar for Spec Home Builders →
Kirkland, Redmond & Bothell →
Repeatable Solar Programs →
Permitting & AHJ Coordination →
Utility Coordination →
Rough-In & Trim Guide →
Solar vs. Heat Pump →
Builder Solar FAQ →
Homebuilders Hub →